• enquiries@vstraffic.co.uk
  • 07493 947 807

 

Posts tagged "VS Traffic"

Choose from a variety of Traffic & Transportation Services

Junctions | Queues | Saturation Flow | Degree of Saturation | Cyclists | Pedestrians | Crossing Facilities | Bus + Rail | On-Street Parking | Lambeth Methodology | Parking Compliance | Car Parks | Park + Ride | Vehicle Occupancy | Questionnaires | Number Plates | Origin-Destination | Intricate Networks | Cordon Studies | Journey Time | In-House Video Analysis | Independent Data Verification | Diligence Checks | Numerical Analysis | Graphical Representation | Bespoke Reporting

#TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts #TrafficSurveys

Why Choose VS Traffic

A Complete Service Whilst our firm was set-up on the basis of expert data collection and analysis services, the in-depth career experience and professional qualifications of our senior founding team means that we can competently handle your transport planning projects.  Whether it’s traffic surveys, junction read more

Dedicated in-house facilities We are one of less than a handful of UK survey companies with complete dedicated in-house facilities.  When you instruct VS Traffic, you can rest assured all projects will be completed in-house from survey through to analysis and final reporting - guaranteeing you total quality control.  read more

Our Success lies in Accuracy and Transparency With the recent flurry in off-shore counting start-ups over the past few years, many UK firms have been jumping on to this bandwagon, transferring the counting from their firm (if any) to an offshore third party firm over which they have no control.  read more

#TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts #TrafficSurveys

Our Work

Bicester Village, Bicester Developer-led study based on relocation of large food retail store and associated extension of shopping centre. Multi-site and multi-faceted number plate, junction, and pedestrian survey looking at Origin-Destination Trips, Journey Times, Vehicle Speeds, Queue Lengths, Trip Generation, and Car Parking Utilisation Assessments including Duration of Stay.

Croydon Transport Model Public Transport and road user study with key focus on Journey Times on numerous routes, particularly those criss-crossing the Croydon Tram-link. Various survey methods used including in-vehicle moving-observer verification and number plate data, as well as determination of Origin-Destination Trips.

Carlisle Cordon Study City-wide cross-matrix Origin-Destination study looking at key trips and journey times, principally using number plate data.

Enfield Residential Routes Rat-running study through a number of discrete residential zones identifying routes used and abused to avoid congestion on principal roads, as well as journey time information.

Fosse Park Leicester Junction and queue studies alongside car park utilisation and departure transition time, in and around strategic road network surrounding popular out-of-town retail park.

Hereford Multi-Modal Study Multi-modal study of road users and pedestrians, as well as origin-destination study of key radial routes.

Lambeth CPZ Review Borough-wide CPZ review of all parking stock in all zones, with production of interactive database for parking capacity queries.

Southend Parking Assessments Assessment of key parking stock both on- and off-street including surface and multi-storey car parks, looking at capacity, utilisation, and duration of stay.

#TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts #TrafficSurveys

Parking and CPZ Surveys

New Page 1

Parking and CPZ Surveys

Parking surveys range from on-street, to off-street, to CPZ assessment and reviews involving several streets. Results from parking surveys can be a critical determinant in many design or development-led decisions. Sometimes, an understanding of the current level and type of usage is sought, on which projections can be made for future use. Projects requiring parking surveys may include development or conversion of a single house, new-build apartment blocks, office development, parade of shops, retail superstore, out of town retail parks, industrial estates comprising many enterprises/businesses, a large distribution centre, park-and-ride sites, airport parking, campus parking, student or staff parking, or event parking, etc.

Controlled Parking Zones (CPZs) are an important planning tool for keeping check on appropriate use of parking. CPZ surveys can be used to understand current utilisation and performance, and emerging trends – whether for residential, business, mixed, short-stay, loading, taxi, pick-up/drop-off, and whether facilitated by permits, pay-and-display, or free, etc. A specific application of parking surveys is the Lambeth Methodology. This assessment system is typically used in urban settings across the country, and we can proudly say that we are the pioneers of this system, developed in 2002. Applications include residential schemes, commercial schemes, conversions, change of use, etc.

Talk to VS Traffic today to discuss your requirements #TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts #TrafficSurveys

Questionnaire/Travel Surveys

Questionnaire/Travel Surveys

Sometimes there is a need for a more detailed understanding of travel patterns or choices. In this case, direct questionnaire surveys can yield results with a deeper meaning than the interpretations of a volumetric survey. Questionnaire surveys may be carried out on the high street, a shopping centre, car park, on public transport, doorstep residential interviews, etc. Typical questions are based around route choice, origin/destination information, journey purpose, party size, etc.  

Talk to VS Traffic today to discuss your requirements #TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts #TrafficSurveys

Pedestrian and Cyclist Surveys

Pedestrian and Cyclist Surveys

Carried out at almost any location, whether on the public highway, rural path, in and around transport facilities, and whether dedicated or shared. No matter what the mode of transport, pedestrians are the key to every journey. Understanding their habit, patterns, route choices, and travel needs, are important factors in successful planning and design. Cycling has come to the fore in contemporary planning, particularly in the urban environment - provision of facilities and appropriate management of infrastructure ensures sustainable travel habits. Many cyclists choose to cycle as a conscientious lifestyle and travel choice, and understanding their travel patterns and needs lead to better environments, notably cleaner and greener.  

Talk to VS Traffic today to discuss your requirements #TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts #TrafficSurveys

Leicester Fireworks

Back in Leicester this weekend, and so much happening on the roads in Highfields, Pot holes have been filled, roads have become one-way  making it easier for Traffic to flow and provide better parking, transformation of London road will start soon, all good news for Leicester. We also took the time yesterday to short-video the Fireworks taking place at  Leicester Racecourse - do enjoy

#TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts

Public Transport Surveys

Any aspect of road- and rail-based public transport, whether buses, trams, taxis, or trains. Surveys range from passenger boarding and alighting activity, bus stop activity, route performance surveys, and occupancy, to route choice questionnaires, access counts, barrier surveys, and Park + Ride user surveys etc.  

#Transport Assessments #Traffic Assessments #Construction Projects #VantageSurveys #Modal Highways Consultants

Traffic & Transport Assessments

Traffic & Transport Assessments

Some development planning applications require a Transport Statement or Transport Assessment (or better known as a TS or TA), especially if they are expected to have a traffic or transport impact on the highway network.

What is a TS or TA?  Development projects that are expected to have a low impact may be accompanied by a TS, which doesn’t require extensive calculations but does require a meaningful statement and acknowledgement of the relevant issues.  Development projects that are expected to have an appreciable or significant impact must be accompanied by a TA.  This requires a comprehensive analysis of all the traffic and transport issues for all forms of travel, arising from the development.  In comparison, a TS is relatively straightforward, whilst a TA requires greater input.

Learn more about Transport Assessments

 #Transport Assessments #Traffic Assessments #Construction Projects #VSTraffic

Be safe

Now with the schools back in action, remember to drive safely. keep an eye out for Pedestrians, specially the younger ones walking to schools. We at VS Traffic are busy analysing traffic data for our clients before we go out back on the road to complete Transport Assessments and Parking Surveys.

Contact

VS Traffic Data Services
109 Coleman Rd
Leicester, LE5 4LE

07493 947 807

07445 494 456

This email address is being protected from spambots. You need JavaScript enabled to view it.

9.00 am to 5.00 pm

Traffic Data Services

Junctions | Queues | Saturation Flow | Degree of Saturation | Cyclists | Pedestrians | Crossing Facilities | Bus + Rail | On-Street Parking | Lambeth Methodology | Parking Compliance | Car Parks | Park + Ride | Vehicle Occupancy | Questionnaires | Number Plates | Origin-Destination | Intricate Networks | Cordon Studies | Journey Time | In-House Video Analysis | Independent Data Verification | Diligence Checks | Numerical Analysis | Graphical Representation | Bespoke Reporting

            Instagram

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of this site have already been set To find out more about the cookies we use and how to delete them, see our privacy policy.

  I accept cookies from this site.